Erosion-protection materials for water-conveyance slopes in an arid, high-temperature-range setting. Recorded procurement: 16,820 m².

Arid-region water-conveyance channel protection · Engineering application visualization
Application
Water-conveyance slope protection
Purchasing company
安徽正晖建设工程有限公司
Recorded procurement quantity
16,820 m²
Materials
Erosion-control reinforced mesh and mattresses

Regional water supply for Zhundong

Public Xinjiang reporting identifies Zhundong Water Supply Phase II among major water-resource infrastructure projects. The works form part of the regional supply system. Zhongman's purchasing counterpart for this record is the company identified above.

Erosion protection in an arid setting

The company-provided brief concerns open-channel slope protection in an arid setting with large temperature variations. The procurement record lists 16,820 m² of erosion-control reinforced mesh and mattresses, focusing on slope stability and connections between the bank toe and channel bed.

Coordinating the protection system

Mesh orientation, mattress compartments, lacing and terminations need to align with the channel cross-section. Mesh opening, wire diameter, coating and connections should be confirmed against the project's materials schedule and drawings.

Discuss your materials schedule