Back to projects

Puhe River flood control and drainage, Lot 2

Liaoning · Shenyang, Puhe basin

Application reference image

Project context

The domestic record describes a Puhe flood-control cross-section combining gabion retaining walls with slope mattresses.

Selection considerations

Review the cross-section, foundation and toe conditions, then confirm basket or mattress structure, connections, corrosion protection and stone requirements against project design documents.