Back to projects

Songhua River main embankment flood-control works

Heilongjiang · Harbin / Jiamusi

Application reference image

Project context

The domestic record discusses seasonal water-level changes and toe scour on the Songhua River, with stepped gabion toe protection and river-facing slope reinforcement.

Selection considerations

Review the cross-section, foundation and toe conditions, then confirm basket or mattress structure, connections, corrosion protection and stone requirements against project design documents.